Skip to content
B-806, Ithum Tower, Sector 62, Noida|Mon – Sat, 9:30 AM – 6:30 PM
+91-9818473246|gocompliances@gmail.com|WhatsApp
Factory & Industrial Licensing

Factory License

Plan approval, factory licence and renewals with the state factories and boilers department — prepared, filed and followed up by specialists.

  • End-to-end handling
  • Expert-reviewed filings
  • Pan India
Factory License OSH Code, 2020 Apply online 9 Documentschecklist verified 5 Step processend-to-end Pan India
9Documents
5Process steps
4Laws & rules
PanIndia coverage

What is Factory License?

What it is and why it matters

Every manufacturing unit that qualifies as a 'factory' must obtain approval and a licence before starting operations. Getting it right first time saves months of delay.

A factory licence is the permission issued by the state factories department (Directorate of Industrial Safety and Health, or Chief Inspector of Factories) to operate a manufacturing premises. Earlier governed by the Factories Act, 1948, factory registration and licensing now sit under the OSH Code, 2020 and the rules notified by each state.

Under the OSH Code a 'factory' generally means premises where 20 or more workers are employed with the aid of power, or 40 or more without power (previously 10 and 20). Plan approval may be required before construction or extension, followed by the licence before manufacturing starts.

At a glance
Governing lawOSH Code, 2020
Applies toNew manufacturing units crossing the factory threshold
Documents9 documents
Process5 steps, end to end
CoverageAll states & UTs

Who Needs This Service?

Businesses this applies to

New manufacturing units crossing the factory threshold
Existing factories expanding capacity, adding power or changing layout
Units changing ownership, occupier or manager
Food processing, pharma, engineering, textile, chemical and packaging units

Applicable Regulations

Laws and rules that govern it

OSH Code, 2020Definition of factory, registration, licensing, safety, health and welfare provisions
State OSH / Factory RulesForms, fees, plan approval and licence validity in each state
Water Act, 1974 and Air Act, 1981Consent from the State Pollution Control Board is usually needed alongside
State Fire Service ActFire NOC for the building, where applicable

Required Documents

Keep these ready

01Site plan, building plan and machinery layout drawings
02Ownership deed or lease / rent agreement
03Structural stability certificate from a competent person
04List of directors / partners and occupier details with ID proof
05Manager details and appointment letter
06Details of manufacturing process, raw materials and products
07Installed power load (electricity bill / sanction letter)
08Pollution Control Board consent (CTE / CTO)
09Fire NOC where applicable

The exact list depends on your state and entity type — we share a precise checklist after a quick review.

Step-by-Step Process

How we get it done

  1. 01

    Applicability and site review

    We check whether your unit meets the factory definition and identify approvals needed.

  2. 02

    Drawings and plan approval

    Drawings are prepared or reviewed and submitted for plan approval where required.

  3. 03

    Licence application

    The registration and licence application is filed online with fees on the state portal.

  4. 04

    Inspection support

    We prepare you for and attend the inspection by the factories department.

  5. 05

    Licence issue and renewal

    Once issued, renewal dates and amendments are tracked for you.

Ready to start your Factory License?Free applicability check · We handle everything end to end

Common Mistakes & Compliance Risks

What to avoid

Common mistakes

  • Starting production before the licence is issued
  • Expanding machinery or worker count without amending the licence
  • Submitting drawings that do not match the actual layout
  • Overlooking pollution and fire approvals that the licence depends on

Penalties & risks

  • Penalties and prosecution of the occupier and manager
  • Prohibitory or closure orders by the inspector
  • Difficulty obtaining finance, insurance or customer approvals

Penalty amounts are prescribed by the applicable Code, Act or state rules and are revised from time to time.

Related Services

You May Also Need

CallWhatsAppEnquireConsult